Vertical IP8024 Instalační příručka Strana 49

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 160
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 48
Main Processing Board 4-7
Chapter 4: Board Installation
MBX IP Hardware & Installation Guide
NOTE: As needed, replace the batteries with the same or equivalent type recommended by the
manufacturer; the System will not function normally if the battery is replaced incorrectly. Be sure
to dispose of used batteries according to manufacturer instructions and/or local gov’t regulations.
LED Indications
NOTE: When several ISDN boards are installed, Default automatic clock priority of Slots and KSUs will
be as follows unless modified by the Admin. (PGM301):
•Boards - PRIB>Internal Clock
KSUs
- 1st KSU>2nd KSU>3rd KSU
•Slot
- Slot 1>Slot 2>…>Slot 18
LED Indication (MJ1)
LED DESCRIPTION
LD1 (Blue), TMR Timer, Periodic Toggle — ON, 100msec; OFF, 100msec.
LD2 (Blue), CALL Call Task Status — ON, Call task activated; OFF, Call Task idle
LD3 (Blue), SYNC External ISDN Board Clock synchronization ON: PLL circuit activation by External Clock
from ISDN Board; MBX IP will be operated on the basis of external ISDN clock (refer to
“NOTE”). OFF: PLL activation by Internal Clock;
MBX IP will be operated on the basis of
internal clock.
LD4 (Blue), PWR System DC Power ON Indication – ON, Power ON; OFF, Power OFF
LED DESCRIPTION
1 (Green) Link Status LED – ON: Link OK, OFF: No Link
2 (Orange) Speed Status LED – ON: 100Mbps, OFF: 10Mbps
Release 1.7
April 2012
Zobrazit stránku 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 159 160

Komentáře k této Příručce

Žádné komentáře